RFPRound

Contract Opportunities · DEPT OF DEFENSE

Bonneville Powerhouse II Unwatering Pump Replacement

AgencyDEPT OF DEFENSE
Solicitation NumberW9127N27BA012
Notice TypeSolicitation
NAICS237990
Set-AsideSmall Business Set Aside - Total
Place Of Performance
PostedNov 5, 2026
SourceFederal — SAM.gov
Response DeadlineDec 7, 2026 31 days left as of Nov 6, 2026
Time Left31 days left as of 2026-11-06
PrimaryAragon Liebzeit · [email protected] · 5038084610
SecondaryNicole Adams · [email protected] · 5038084614
Official NoticeView On SAM.gov

About this opportunity

11/05/2026: The solicitation is attached. NOTICE OF SOLICITATION NUMBER CHANGE The Bonneville Powerhouse II Unwatering Pump Replacement acquisition, previously announced under presolicitation notice number W9127N26BA018, is now identified as W9127N27BA012 due to the fiscal-year transition. This presolicitation notice continues the announcement of the same acquisition under the new number; it does not represent a separate requirement. All subsequent notices and solicitation documents for this acquisition will reference solicitation number W9127N27BA012. The original presolicitation notice under W9127N26BA018 is available here: https://sam.gov/workspace/contract/opp/dce799052d0043619ff7a08ccb237c50/view The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will be from Interstate 84 on the Oregon side of the Columbia River via Exit 40, approximately four miles west of Cascade Locks, Oregon. All work for this project is in Skamania County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI), and requires the contractor and or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful bidder must have a current CMMC status at Level 1 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the bidder ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI on contractor information systems in the performance of this contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will not process, store, or transmit FCI in performance of the subcontract, then no CMMC level is required for that subcontractor. If a subcontractor will only process, store, or transmit FCI in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI must have an active SAM registration and a current NIST SP 800 171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to providing all labor, equipment, and materials required to procure, install, and test one vertical turbine unwatering pump assembly per the Contract specifications. The Government will remove the existing pump. Procure and install one 7,000 gpm vertical turbine unwatering pump. Procure and install all the discharge head piping necessary to connect with existing discharge piping to the North pump assembly. Procure and install one 460V, 3 phase motor as detailed in the specifications. Test all equipment prior to commissioning and turning over to the Government. The anticipated completion date for physical construction is 180 calendar days after receiving the Notice to Proceed. The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract. The estimated magnitude of construction is between $500,000 and

Who can apply

Set-aside: Small Business Set Aside - Total — as stated in the official notice: “Small Business Set Aside - Total”. Verify eligibility on the official notice before bidding.

Source: SAM.gov. Verify every deadline on the official notice.