Contract Opportunities · GENERAL SERVICES ADMINISTRATION
Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus
| Agency | GENERAL SERVICES ADMINISTRATION |
| Solicitation Number | 47PB5126R0038 |
| Notice Type | Solicitation |
| NAICS | 236220 |
| Set-Aside | No Set-Aside |
| Place Of Performance | Washington, DC, 20032 |
| Posted | Nov 5, 2026 |
| Source | Federal — SAM.gov |
| Response Deadline | Nov 23, 2026 17 days left as of Nov 6, 2026 |
| Time Left | 17 days left as of 2026-11-06 |
| Primary | Jennifer Silkensen · [email protected] · 215-446-5099 |
| Official Notice | View On SAM.gov |
About this opportunity
Amendment 0003 is hereby posted. ________________________________________________________________________ Amendment 0002 is hereby posted. ________________________________________________________________________ Amendment 0001 is hereby posted. ________________________________________________________________________ The General Services Administration (GSA), Public Buildings Service (PBS), is seeking a qualified contractor for construction services for the Gate 7 Parking Garage at the St. Elizabeths West Campus in Southeast Washington, DC. GSA anticipates awarding a single Firm-Fixed-Price construction contract for the new construction of the Gate 7 Parking Garage and associated site, utility, security, stormwater, landscape, and infrastructure improvements. The project will support the operational needs of the U.S. Department of Homeland Security (DHS) at the St. Elizabeths West Campus. This acquisition is for construction services only. The project design is being completed separately by GSA�s Architect of Record, ZGF. The construction solicitation is based on Issued for Construction drawings, specifications, and related contract documents. The work to be performed under the terms of this contract includes, but is not limited to, furnishing all management, supervision, subcontractors, labor, materials, supplies, tools, equipment, coordination, quality control, testing, inspections, commissioning support, and closeout documentation necessary to construct the Gate 7 Parking Garage in accordance with the contract documents. The project includes construction of a new multi-level parking garage with associated surface parking, access and screening infrastructure, and related campus improvements. The anticipated scope includes, but is not limited to: Site development, clearing, grading, excavation, and civil infrastructure improvements Utility relocations, extensions, tie-ins, and connections Substructure construction, including foundations, slab-on-grade, excavation support, waterproofing, and retaining walls Parking garage structure, including structural framing, parking decks, ramps, stairs, elevators, roof assemblies, and related structural components Mechanically ventilated parking garage systems, including ventilation equipment, shafts, ductwork, louvers or openings, controls, electrical power, life-safety interfaces, testing, balancing, and commissioning support Exterior fa�ade and building envelope construction, including a classical architectural brick fa�ade with openings Exterior doors, windows, louvers, waterproofing, sealants, flashings, and related envelope components Mechanical, electrical, plumbing, fire protection, fire alarm, emergency communications, lighting, controls, IT, telecommunications, electronic security, access control, CCTV, parking guidance, and related systems Physical security elements, including vehicle barriers, bollards, gates, credentialing areas, and screening-related infrastructure Roadway, shuttle, pedestrian circulation, hardscape, landscape, site lighting, signage, and related site improvements Stormwater management facilities, erosion and sediment control, and environmental protection measures Testing, inspections, commissioning support, training, warranties, as-built documentation, BIM/COBie deliverables where applicable, and project closeout The Gate 7 Parking Garage will be constructed within the active St. Elizabeths West Campus, a high-security federal campus and National Historic Landmark. The contractor will be required to coordinate construction activities with ongoing campus operations, security requirements, occupied facilities, existing utilities, shuttle operations, adjacent work, traffic and access impacts, and protection of historic and environmental resources. The contractor may also be required to coordinate with District of Columbia agencies or authorities, as applicable, for traffic control, haul routes, public space, utility, roadway, permit, or other construction-relat
Who can apply
Set-aside: NONE — as stated in the official notice: “NONE”. Verify eligibility on the official notice before bidding.
Amendments Tracked By RFPRound
- 2026-11-06 - Deadline moved 2026-11-09 21:00 UTC -> 2026-11-23 21:00 UTC (observed across SAM.gov feeds today)
Source: SAM.gov. Verify every deadline on the official notice.