RFPRound

Contract Opportunities · Port of Seattle

Electric Vehicle Charging Stations Seaport Unit Price 2027

AgencyPort of Seattle
Solicitation NumberMC-0322998
Notice TypeMajor Construction
NAICS
Set-Aside
Place Of PerformanceSeattle, WA
PostedNov 2, 2026
SourcePort of Seattle — via VendorConnect
Response DeadlineDec 3, 2026 26 days left as of Nov 7, 2026
Time Left26 days left as of 2026-11-07
PrimaryMontenegro, Marilynn · [email protected] · 206-886-9628
Official NoticeView On Port of Seattle — via VendorConnect

About this opportunity

The Work includes furnishing all labor, materials, equipment, tools, and incidentals necessary to provide complete and functional electrical system installations to support electric vehicle (EV) charging infrastructure in a maritime setting. Work includes, but not limited to installation of raceways, conduit systems and wiring. Installation of medium-voltage cabling, junction boxes, transformers, grounding systems, and miscellaneous electrical devices. Installation of EV charging equipment, mounting hardware, protective enclosures, and associated infrastructure suitable for marine environments. Provision of temporary power and lighting as required to support construction activities. Testing, commissioning, and verification of all electrical and EV charging systems in compliance with applicable codes, standards, and requirements of all authority‑having‑jurisdiction (AHJ) agencies. Contractor's electricians must be able to report with in a 2-hour period and provide combination of (2) two employees on a continuous 24-hour period and at multiple locations on the same day. Contractor should expect multiple Work Authorizations that overlap requiring adequate staffing levels.

Listing data from Port of Seattle — via VendorConnect, the official portal. Verify every solicitation on its official listing before bidding.