RFPRound

Contract Opportunities · DEPT OF DEFENSE

Amended FINAL RFP - Landing Gear Collaborative Supply Chain Integration II

AgencyDEPT OF DEFENSE
Solicitation NumberSPRHA1-26-R-1003
Notice TypeSolicitation
NAICS336413
Set-AsideSmall Business Set Aside - Total
Place Of Performance
PostedOct 29, 2026
SourceFederal — SAM.gov
Response DeadlineMar 1, 2027 114 days left as of Nov 7, 2026
Time Left115 days left as of 2026-11-07
PrimaryNathan Flinders · [email protected]
SecondaryJustin Rogers · [email protected]
Official NoticeView On SAM.gov

About this opportunity

29 October 2026 Update: RFP Amendment 0001 posted with updated attachments. The only attachments with changes are: Attachment 1 - TEP Worksheet Attachment 2 - TRD Attachment 3 - Section L Attachment 4 - Section M All other attachments remain as posted in original RFP. Response date of 1 March 2027 is unchanged. Please sign and return Amendment along with proposal. RFP Description: Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) Overview Defense Logistics Agency (DLA) Aviation at Ogden is issuing this formal solicitation for the Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) program. This requirement is being competed as a 100% Small Business Set-Aside under full trade-off source selection procedures. Solicitation Number: SPRHA1-26-R-1003 Set-Aside Status: 100% Small Business Set-Aside NAICS Code: 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing PSC Code: 1620 - Aircraft Landing Gear Components Contract Type: Single-Award ID/IQ (Firm-Fixed-Price with EPA) Period of Performance: 10 Years (5-Year Base + One 5-Year Option) Scope of Work The LG-CSCI2 program provides performance-based supply chain support for competitive landing gear components associated with USAF aircraft. The scope encompasses approximately 2,800 National Item Identification Numbers (NIINs), including USAF Depot Level Reparables (DLRs) and DLA consumables. These range from simple consumable items to complex DLRs requiring forgings and long lead times. The Prime Contractor will provide end-to-end supply chain management, engineering oversight, quality assurance, and procurement. Key program objectives include: Achieving a 95% On-Time Delivery (OTD) rate for DLA-managed parts and a 90% OTD rate for USAF-managed parts. Reducing Production Lead Times (PLTs) across the supply chain by a minimum of 25%. Executing strategic raw material purchasing, forging die management, and Obsolescence/DMSMS management. Solicitation Attachments & Instructions The official Request for Proposal (RFP), Technical Requirements Document (TRD), and other applicable attachments are provided in this posting. Note on Bid Sets: Bid sets for the individual NIINs are not hosted directly on SAM.gov. They will be mailed via removable drives to interested parties. Please provide your firm's mailing address to the DLA Contracting POCs listed below to request a removable drive be mailed to you. Points of Contact: Primary: Nathan Flinders, Contracting Officer ([email protected]) Secondary: Justin Rogers, Contracting Officer ([email protected])

Who can apply

Set-aside: Small Business Set Aside - Total — as stated in the official notice: “Small Business Set Aside - Total”. Verify eligibility on the official notice before bidding.

Source: SAM.gov. Verify every deadline on the official notice.