RFPRound

Contract Opportunities · DEPT OF DEFENSE

HOSE ASSEMBLY

AgencyDEPT OF DEFENSE
Solicitation NumberN0010426QAC67
Notice TypeSolicitation
NAICS333998
Set-AsideNo Set-Aside
Place Of Performance
PostedNov 5, 2026
SourceFederal — SAM.gov
Response DeadlineNov 20, 2026 14 days left as of Nov 6, 2026
Time Left14 days left as of 2026-11-06
PrimaryTelephone: 7176055834 · [email protected]
Official NoticeView On SAM.gov

About this opportunity

CONTACT INFORMATION|4|N97113|FA|771-229-0460|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|Inspection / Acceptance Point: Source|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|[email protected]| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (DEV 2026-O0037)(FEB 2026)|20|326220|800||||||||||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Amended until 20 NOV 2026. MFR Austin Hose Assembly Assy. Number:HA-R16S06-06FJX-06FJX-13.00 Hose Number: R1606 Hose ID: .375 Length: 13 THD: .5625-18 All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. \ Note: Thi is a shelf life item (W UU). Please ensure your material can meet this requirement prior to quoting. TO VIEW THE DRAWINGS: Go to www.sam.gov Click: Contract Opportunities and enter the solicitation number. This gives access to the Electronic Solicitation. Drawings can be viewed or downloaded. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY 90 DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture of the HOSE ASSEMBLY . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the drawings shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=26998 |10001| 4|OD |D| | | | DRAWING DATA=3263784 |10001| H|DW |D| | | | 3. REQUIREMENTS 3.1 Manufacturing and Design - The HOSE ASSEMBLY furnished under this contract/purchase order shall meet the material and physical requirements as specified ;P/N 3263784-4 cage 10001; . 3.2 Marking - Unless marking requirements are

Who can apply

Set-aside: NONE — as stated in the official notice: “NONE”. Verify eligibility on the official notice before bidding.

Source: SAM.gov. Verify every deadline on the official notice.