RFPRound

Contract Opportunities · AGRICULTURE, DEPARTMENT OF

Ross Springs Waterline Replacement

AgencyAGRICULTURE, DEPARTMENT OF
Solicitation Number1240LT27Q0022
Notice TypeCombined Synopsis/Solicitation
NAICS237110
Set-AsideSmall Business Set Aside - Total
Place Of PerformanceUT, 84078
PostedNov 3, 2026
SourceFederal — SAM.gov
Response DeadlineNov 21, 2026 14 days left as of Nov 7, 2026
Time Left14 days left as of 2026-11-07
PrimaryDerrick A Dodson · [email protected]
SecondaryCathleen Christensen · [email protected]
Official NoticeView On SAM.gov

About this opportunity

This project includes the replacement of 4� asbestos cement pipe (abandoned in place) with 4� HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4� HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.

Who can apply

Set-aside: Small Business Set Aside - Total — as stated in the official notice: “Small Business Set Aside - Total”. Verify eligibility on the official notice before bidding.

Source: SAM.gov. Verify every deadline on the official notice.