RFPRound

Contract Opportunities · DEPT OF DEFENSE

48--ACTUATOR,HYDRAULIC-, IN REPAIR/MODIFICATION OF

AgencyDEPT OF DEFENSE
Solicitation NumberN0010427QZA04
Notice TypeSolicitation
NAICS332919
Set-AsideNo Set-Aside
Place Of Performance
PostedOct 29, 2026
SourceFederal — SAM.gov
Response DeadlineNov 30, 2026 24 days left as of Nov 6, 2026
Time Left24 days left as of 2026-11-06
PrimaryTelephone: 7176054056 · [email protected]
Official NoticeView On SAM.gov

About this opportunity

CONTACT INFORMATION|4|N742.10|WV2BB|N/A|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice and Receiving Report (COMBO)|N/A|TBD|N00104|TBD|TBD|N50286|TBD|N/A|N/A|N/A|N/A|N/A|N/A|N/A|1-866-618-5988 - WAWF Helpdesk| MONETARY LIMITATION REPAIR PURCHASE ORDERS|1|TBD| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. All contractual documents (i.e., contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either in the mail, transmitted by facsimile, or sent by other electronic methods, such as email. The Government's acceptance of the contract proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. The following proposed delivery schedule applies: Final delivery of material shall be on or before 86 days after the effective date of the contract. 3. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See FAR Clause 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 4. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 5. All transportation to/from the repair site will be paid for by the US Navy. 6. Include in the estimated price all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV reporting. Please include the following: a. Teardown and Evaluation Rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration Date: A cost of new price shall also be provided in addition to the repair price. 7. This requirement utilizes Government Furnished Property (GFP). Any GFP located at the contractor's facility in storage that can be used for repair of the requirement must be utilized and called out within the final quote. 8. The contractor shall comply with the Commercial Asset Visibility (CAV) of the asset(s) in this order in accordance with NAVSUPWSSFA24. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the ACTUATOR,HYDRAULIC- . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 Specification Revisions - The specification revisions listed under "D

Who can apply

Set-aside: NONE — as stated in the official notice: “NONE”. Verify eligibility on the official notice before bidding.

Source: SAM.gov. Verify every deadline on the official notice.