RFPRound

Contract Opportunities · DEPT OF DEFENSE

Remanufacture of B-2 Actuator, Electromechanical, Rotary

AgencyDEPT OF DEFENSE
Solicitation NumberFA8118-27-R-0001
Notice TypeSolicitation
NAICS336413
Set-AsideNo Set aside used
Place Of Performance
PostedOct 7, 2026
SourceFederal — SAM.gov
Response DeadlineNov 19, 2026 13 days left as of Nov 6, 2026
Time Left13 days left as of 2026-11-06
PrimaryNonika Allen · [email protected]
SecondaryAmy GIL · [email protected]
Official NoticeView On SAM.gov

About this opportunity

A 3-YEAR BASIC, FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED. THE GOVERNMENT ANTICIPATES A SOLE SOURCE AWARD TO Eaton (CAGE: 86090). 52.232-18 Availability of Funds. As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984) Funds are not presently available for this contract. The Government�s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. (End of clause) (a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively. (b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs). (c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Tinker AFB Small Business Office. For questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009. Email: [email protected] Website: https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at https://safe.apps.mil/. DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they �Request a Drop-Off� to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE. [email protected]. For more information on the Strategic Alternate Sourcing Program, please visit: https://www.tinker.af.mil/Home/429SCMS-SASPO/ As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification. In order to receive any technical data related to this acquisition, offerors must request access to the TO on https://etims.cce.af.mil/ETIMS/index. In order to receive drawings (previously done through JEDMICS), contractors will need to request access to the ATeam via a DD Form 2875. Requests will be made to [email protected]. The PCO listed above will be the government sponsor for the DD Form 2875. (d) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c)) Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as �estimated� or �maximum� will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. (e) END ITEMS BEYOND REMANUFACTURE "Reparable End Items" are defined as end items which can be restored to a se

Who can apply

Set-aside: No Set aside used — as stated in the official notice: “No Set aside used”. Verify eligibility on the official notice before bidding.

Source: SAM.gov. Verify every deadline on the official notice.