Contract Opportunities · TRANSPORTATION, DEPARTMENT OF

AZ BL COLO 7528(1) Burro Creek Road

AgencyTRANSPORTATION, DEPARTMENT OF
Solicitation Number6982AF27B000002
Notice TypeSolicitation
NAICS237310
Set-AsideSmall Business Set Aside - Total
Place Of PerformanceKingman, AZ, 86401
PostedNov 5, 2026
SourceFederal — SAM.gov
Response DeadlineNov 17, 2026 11 days left as of Nov 6, 2026
Time Left11 days left as of 2026-11-06
PrimaryEric Grosskreuz · [email protected]
SecondaryKelly Palmer · [email protected]
Official NoticeView On SAM.gov

About this opportunity

PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement � October 2026 Award-January - 2027 Construction � January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000

Who can apply

Set-aside: Small Business Set Aside - Total — as stated in the official notice: “Small Business Set Aside - Total”. Verify eligibility on the official notice before bidding.

Source: SAM.gov. Verify every deadline on the official notice.